Consequent to the formation of Telangana State, Telangana State Electricity Regulatory Commission (TSERC) was constituted on 3rd November, 2014. TSERC aims to improve the functionality of the Power Sector in the State of Telangana to make it viable and with prime focus of protecting the interests of the consumers. The Website is part of the attempts of the Commission to ensure transparency in its functioning. Suggestions for improvement of the website are welcome.      More..

Latest


Title View
Commission passed order in O.P.No. 28 of 2021 & I.A.No.10 of 2021 Dated 14.09.2021 filed between M/s Southern Power Distribution Company of Telangana Limited, Northern Power Distribution Company of Telangana Limited and Nil. View
Commission passed order in O.P.No. 38 of 2021 Dated 09.09.2021 filed between M/s Sri Ambika Steel Industries Vs Southern Power Distribution Company of Telangana Ltd, Senior Accounts Officer, Operation, TSSPDCL, Superintending Engineer, Operation, Rajendranagar, TSSPDCL, Chief General Manager (Commercial), TSSPDCL, Superintending Engineer, Operation, Mahabubnagar, TSSPDCL. View
Commission passed order in O.P.No. 9 of 2021 Dated 09.09.2021 filed between M/s Madhucon Sugar and Power Industries Limited Vs Northern Power Distribution Company of Telangana Limited. View
Commission passed order in O.P.No. 14 of 2021 and I.A.No. 5 of 2021 Annual Performance Review/True-Up of State Load Despatch Centre for FY 2019-20. View
Commission passed order in O.P.No. 13 of 2021 and I.A.No. 6 of 2021 Annual Performance Review/True-Up of Transmission Corpopration of Telangana Limited for FY 2019-20. View
Commission passed order in O.P.(SR) No.36 of 2021 Dated 30.08.2021 filed between M/s. BVM Energy and Residency Private Limited Vs M/s. Transmission Corporation of Telangana Limited, The Chairman & Managing Director, TSSPDCL & Chief General Manager (IPC & RAC), TSSPDCL. View
Commission passed order in I.A.No. 11 of 2021 in R.P.(SR)No. 19 of 2021 in O.P.No.24 of 2020 Dated 27.08.2021 filed between M/s.Southern Power Distribution Company of Telangana Limited, M/s.Northern Power Distribution Company of Telangana Limited vs Nil. View
Commission passed order in O.P.No.10 of 2016 Dated 25.08.2021 in the matter of according approval to the Power Purchase Agreements (PPAs) entered into between NTPC Limited and TSDiscoms for purchasing electricity from Telangana Super Thermal Power Station (TnSTPS) (Phase I) (2x800 MW) located at Jyothi Nagar (formerly Ramagundam) in Peddapalli (formerly Karimnagar) District, Telangana State. View
Commission passed order in R.P.No. 1 of 2021 in O.P.No.27 of 2020 Dated 23.08.2021 filed between M/s L&T Metro Rail (Hyderabad) Limited vs Southern Power Distribution Company of Telangana Limited. View
Commission passed order in O.P.No.29 of 2021 & O.P.Nos.30 to 35 of 2021 Dated 19.08.2021 in the matter of according consent of Power Sale Agreements (PSAs) entered between. 1. TSDISCOMs and NTPC for a quantum of 400 MW under Phase-II, Batch-II Tranche-I of National Solar Mission. 2. TSDISCOMs and SECI for a quantum of 400 MW under ISTS MNRE Scheme Tranche VI. View

Errata
Commission passed order in O.P.No.71 of 2018 Dated 11.08.2021 filed between M/s MSR Mega Bio-Power Private Limited vs Northern Power Distribution Company of Telangana Limited. View
Commission issues order in O.P.No.15 to 19 of 2021 Dated 06.08.2021 in the matter of Suo-Moto approval of PPAs between TSDiscoms and TSGenco. View
Commission passed order in R.P.(SR)No.99 of 2018 in O.P.No.21 of 2017 Dated 20.07.2021 filed between Southern Power Distribution Company of Telangana Limited and NIL. View
Commission passed order in R.P.(SR)No.98 of 2018 in O.P.No.21 of 2017 Dated 20.07.2021 filed between Southern Power Distribution Company of Telangana Limited and NIL. View
Commission invites comments/suggestions in the matter of final hearing in O.P. No 10 of 2016 for consent to Telangana Super Thermal Power Plant (TSTPP Phase I) (2x800 MW) established by M/s NTPC Ltd

Last date for receiving comments/suggestions : 06.07.2021 before 5PM.

Date of Public Hearing through Video Conference is Scheduled on 14.07.2021 from 11:30 AM onwards.

Further Hearing (through Video Conference) is on 20.07.2021 at 11:30 AM onwards.
Public Notice

Principal PPA TSTPP Phase 1 (2X800 MW)

Supplementary PPA TSTPP Phase 1 (2X800 MW)

Interim Order issued by TSERC

Responses filed by TS Discoms in O.P.No.10 of 2016

Additional responses made by TS Discoms

Objections

Replies
Commission passed order in R.P.(SR)No.132 of 2018 in O.P.No.36 of 2018 Dated 12.07.2021 filed between M/s GEA BGR Energy System India Limited vs Special Chief Secretary, Energy Department, Southern Power Distribution Company of Telangana Limited and Chief General Manager (IPC & RAC), TSSPDCL. View
Commission passed order in O.P.No. 63 of 2018 Dated 01.07.2021 filed between M/s Srinivasa Power Private Limited vs TSSPDCL. View
Commission passed order in O.P.No. 20 of 2021 & I.A.No. 7 of 2021 Dated 01.07.2021 filed between M/s L&T Metro Rail (Hyderabad) Limited vs Southern Power Distribution Company of Telangana Limited, Superintending Engineer, Operation, TSSPDCL, Habsiguda Circle, Uppal and Superintending Engineer, Operation, TSSPDCL, Medchal, Gunrock. View
Commission issues(SMART GRID) REGULATION, 2021. View

Statement of Reasons
Commission invites comments and suggestions in the matter of SUO-MOTO approval of PPAs between TSDISCOMs and TSGENCO O.P.Nos. 15 to 19 of 2021.

Last date for receiving Comments/Suggestions on or before 18.06.2021 by 5PM.

Last date for receiving Comments/Suggestions is extended to 24.06.2021 by 5PM.

Date of Public Hearing through Video Conference is Rescheduled to 30.06.2021 from 11.30AM onwards.
View

Public Notice

Revised Notice

Objections

Replies
Commission invites comments and suggestions in the matter of Annual Performance Review (True up) for Transmission Business and State Load Dispatch Centre (SLDC) activity of TSTRANSCO for FY 2019-20.

Last date for receiving comments/suggestions : 11.06.2021 before 5PM.

Last date for receiving comments/suggestions is extended to 21.06.2021 before 5PM.

Date of Public Hearing through Video Conference is Rescheduled to 01.07.2021 from 11:30 AM onwards.
Public Notice

Filings :

TSTRANSCO (O.P.No.13 of 2021)             (I.A No 6 of 2021)

TSSLDC (O.P.No.14 of 2021)                     (I.A No 5 of 2021)

Objections

Replies

Practice Directions for Conduct of Hearing by Video Conference.
Commission invites suggestions/ objections/ comments from all stakeholders and public at large in the matter of according consent of Power Sale Agreements (PSAs) entered between.

1. TSDISCOMs and NTPC for a quantum of 400 MW under Phase-II, Batch-II Tranche-I of National Solar Mission.

2. TSDISCOMs and SECI for a quantum of 400 MW under ISTS MNRE Scheme Tranche VI.

Last date to receive suggestions/objections/comments is on or before 16.07.2021 by 5.00 P.M.
Notice

1.NTPC - TS Discoms proposal along with related documents

2.SECI- TS Discoms proposal along with related documents

Objections

Replies
Commission issues(DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATION, 2021. View

Statement of Reasons
Commission invites comments and suggestions in the matter of True up filings of TSGenco for the Control Period FY 2014-19 and Tariff filings of TSGenco for the Control Period FY 2019-24.

Last date for receiving comments/suggestions is Extended upto 12.03.2021 before 5PM

Date of Public Hearing through Video Conference is rescheduled to 31.05.2021 from 11:30 AM onwards.

Public Notice

True up Filings of TSGenco in O.P.No. 5 of 2021

Volume 1    Volume 2



Tariff Filings of TSGenco in O.P.No. 6 of 2021

Volume 1    Volume 2

I.A.No 1 of 2021

Additional Information 1

Additional Information 2

Objections

Replies

Additional Data set

Practice Directions for Conduct of Hearing by Video Conference.
Extension of exemption for Sircilla (CESS) for a period of five (5) years from 01.04.2021 to 31.03.2026. View

Amendment
Wheeling Tariffs for Distribution Business for 4th control period - Amendments Order. Amendment Order
TSERC visit to Smart grid for pilot project. View
Last date for receiving Comments / Suggestions is Extended upto 19.02.2021 before 5pm.

Commission invites Comments/Suggestions from all the stakeholders on Draft TSERC (Deviation Settlement Mechanism and related matters ) regulation, 2020 on or before 19.01.2021 before 5 PM.
Notice

Draft Regulation
Commission invites Comments/ Suggestions in the matter of Suo-Moto determination of compliance of Renewable Power Purchase Obligation of Obligated Entities for FY 2018-19 in O.P. No. 31 of 2020 (suo-moto) on or before 24.12.2020; 5.00 p.m. Virtual public hearing is scheduled on 28.12.2020. Public Notice

TSSLDC report for FY 2018-19

Practice Directions for Conduct of Hearing by Video Conference

Objection Received
Commission issues (DEMAND SIDE MANAGEMENT) Regulations No.1 of 2020 View
Commission invites Comments/Suggestions from all the stakeholders on Draft TSERC (Smart Grid ) regulation, 2020 on or before 16.12.2020 before 5 PM. Notice

Draft Regulation
O.P. No. 24 of 2020

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan (PM-KUSUM) Scheme is scheduled on 18.12.2020.
Press Release

Practice Directions for Conduct of Hearing by Video Conference

Objections Received
Comments/suggestions are invited in the matter of petition filed by M/s.Gayatri Power Private Limited for determination of Tariff for its 2.2 MW hydel power plant (under O.P.No.57 of 2018) on or before 5:00 PM on 26.11.2020. Public Hearing in OP No. 57 of 2018 will be held through video conference on 01.12.2020 18.12.2020. Revised Public Notice

Public Notice

OP.No. 57 of 2018

Add Info1

Add Info2

Objection Received

Replies
Commission invites suggestions/comments from all stake holders on TSERC (Establishment of mechanism for Redressal of Grievances of the Consumers) (2nd Amendment) Regulation, 2020 on or before 16.11.2020 before 5 PM. Public Notice

Draft Regulation
Commission passed order O. P. No. 27 of 2020 & I. A. No. 14 of 2020 Dated 19.10.2020 filed between M/s L&T Metro (Hyderabad) Limited Vs M/s.TSSPDCL. View
O.P. No. 24 of 2020 (Suo-Moto) Commission invites suggestions and comments from all stakeholders and public at large, on the Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan (PM-KUSUM) Scheme on or before 07.11.2020 by 5.00 P.M. Notice (English)

Notice (Telugu)

PM-KUSUM Guidelines
Commission passed order O.P.No.19 of 2020 & I.A.No.13 of 2020 Dated 07.10.2020 filed between M/s Ener Sol Infra Private Limited Vs M/s.TSSPDCL and M/s.Transmission Corporation of Telangana Limited. View
Commission passed order In the matter of mechanism for determination of stranded capacity and framing the terms & conditions for levy of Additional Surcharge on open access users to meet the fixed cost of the distribution licensee arising out of its obligation of supply. View
Commission passed order in R.P.(SR)No.20 of 2020 in O.P.No.14 of 2020 Dated 14.09.2020 filed between M/s.TSSPDCL & M/s.TSNPDCL Vs Nil. View
The Commission, in exercise of powers conferred by the Telangana State Electricity Regulatory Commission (Conduct of Business) Regulations, 2015 (Regulation No.2 of 2015), issues the following practice directions regarding the conduct of hearing by video conference. View
Commission passed order in O.P.(SR)No.26 of 2019 Dated: 07.09.2020 filed between M/s The Federation of Telangana Chambers of Commerce and Industry, VS TSSPDCL & TSNPDCL. View
Commission passed order in I.A.(SR) No.30 of 2020 in O.P.(SR) No.24 of 2020 Dated: 01.09.2020 filed between M/s.L&T Metro Rail (Hyderabad) Limited VS Southern Power Distribution Company of Telangana Ltd. View
Commission passed order in O.P.Nos. 5 of 2020 dated 28.08.2020 filed between M/s. Cooperative Electric Supply Society Limited VS Northern Power Distribution Company of Telangana Ltd. View
Commission passed Order in the matter of true-up for FY 2016-17 to FY 2018-19 and Business plan, Capital Investment Plan & MYT for FY 2019-20 to FY 2023-24 for Singareni Thermal Power Project (2x600MW) of M/s Singareni Collieries Company Limited in O.P. Nos. 4&5 of 2019, 8&9 of 2020 and IA No. 2 of 2020 in O.P. No. 5 of 2019. View
Commission passed Order in the matter of Suo-Moto determination of Variable Cost for the period from FY 2020-21 to FY 2023-24 for existing Biomass, Bagasse and Industrial waste based power projects in the State of Telangana, and having Power Purchase Agreements with the Distribution Licensees. View
Commission passed order in the matter of according approval for amending the distribution and retail supply licence granted earlier to Southern Power Distribution Company of Telangana Limited (TSSPDCL) and also to permit taking over of assets falling under the area of supply of Northern Power Distribution Company of Telangana Limited (TSNPDCL). View
Commission passed order in the matter of according approval for amending the distribution and retail supply licence granted earlier to Northern Power Distribution Company of Telangana Limited (TSNPDCL) and also to permit handing over of assets falling under the area of supply of Southern Power Distribution Company of Telangana Limited (TSSPDCL). View
Commission passed Suo-Moto Order on Mitigation of Impact of COVID-19 – Relaxation of Clause 5.9.4.2 of GTCS and Clause 7.3 of Schedule I of Regulation No.5 of 2016. View
Commission passed Suo-Moto Orders on implementation of the directions of the Government of Telangana to the Telangana Electricity Regulatory Commission under Section 108 of the Electricity Act, 2003 regarding relief measures to Industries. View
Commission passed order in the matter of Suo-Moto Determination of Variable Cost for existing Biomass, Bagasse and Industrial waste based power projects in the State of Telangana, and having Power Purchase Agreements with the Distribution Licensees, for the FY 2019-20. View
Commission passed order in the matter of Suo-Moto Determination of Generic Tariff for electricity generated from Refuse Derived Fuel (RDF) based power projects in the State of Telangana achieving Commercial Operation Date (COD) during the period from FY 2020-21 to FY 2023-24. View
Commission PASSED interim order on billing and other issues during lockdown period on a petition by TSDISCOMS IN O. P. NO. 13 OF 2020 View
REQUEST FOR PROPOSAL for consultancy support on Retainership basis in Regulatory and Other Related matters for TSERC for FY 2020-21. View

Corrigendum
Commission invites Comments/Suggestions on draft on (Deviation, Settlement Mechanism and Related Matters) for the State of Telangana on or before 25.01.2019 before 5 PM. Draft Regulation

Press release
TSERC (Forecasting, Scheduling, Deviation Settlement and Related Matters for Solar and Wind Generation Sources) Regulations, 2018 – Regulation No. 3 of 2018 - Extension of timelines in the regulation – Orders. View
Last date for receiving comments/suggestions on Draft regulation No. of 2018 (1st Amendment to the Regulation No.4 of 2013 [Licensees duty for Supply of Electricity on request]) is extended upto 05.06.2018. Draft
Commission approves Banking Aggrement For In-House captive Generators. View
Cross Subsidy Surcharge for FY 2017-18 [PDF].

Amendment Order

In the matter of determination of Additional Surcharge for FY 2017-18.

View

In the matter of determination of cross subsidy surcharge to be levied by the TSSDISCOMs for the financial years from 2005-06 to 2014-15 in respect of the open access consumers under section 42 of the Electricity Act, 2003.

Press Release

Objection & Replies

Commission initiates proceedings to determine the cross subsidy surcharge for the years 2005-06 to 2014-15.

View

Commission issues notice on the petitions filed by TSDISCOMs for determination of additional surcharge FY 2017-18. TSSPDCL    TSNPDCL   
Public Notice Public Notice
Petition Petition
In the matter of issuance of license afresh or the transmission activity in the state of Telangana to M/s. Transmission Corporation of Telangana in place of license issued by the erstwhile APERC in No. 1 of 2014 dated 11.07.2014 consequent formation of the state Telangana under sec 3 pf Andhra Pradesh Reorganisation Act, 2014 (Central Act, 6 of 2014). Public Notice

TSTRANSCO
Commission passed SLDC Order in the matter of Determination of Annual Fee and Operating Charges for balance two years FY 2017-18 anf FY 2018-19 of the 3rd control period. View
Commission passed Order in the matter of Determination of Capital Cost and Generation Tariff for 2X600 MW Thermal Power Project of the Singareni Coal Colleries Company LTD. for FY 2016-17 to FY 2018-19. View
Extension of time for Filling FPT alternatively initiate suomoto proeesding for Tariff Determination View
Extension of Exemption issued in Order No. TSERC / Secy / 1 / 2015 dated 12.05.2015 in respect of Rural Electricity Co-Operative Societies – SIRCILLA View
Amendment to General Terms & Conditions (GTCS) View
Amendment to Clause 10.3.7 of approved Model PPA for Solar Power Developers(SPDs) View
Title View
Commission invites suggestions/comments from all stakeholders on Draft TSERC Third Amendment (to erstwhile APERC Interim Balancing and Settlement Code for Open Access Transactions (Regulation No. 2 of 2006)) Regulation, 2016 by 31.08.2016 by 5:00 PM Press Release

Draft Regulation
Commission invites suggestions/comments from all stakeholders on Draft Regulation - ( Net Metering Rooftop Solar PV Grid Interactive Systems) Regulation,2016 by 08.08.2016 by 5:00 PM Press Release

Draft Regulation
Regulation No. 05 of 2016 (Licensees’ Standards of Performance) View
Regulation No. 3 of 2016 (Terms & Conditions of Appointment and Payment of Remuneration to Standing Counsel /Advocate on Record and Counsel) View
Regulation No. 01 of 2016 (Compliance Audit) View
Constitution of State Advisory Committee and its Functioning Regulation, 2015 View
Regulation 3 of 2015 (Establishment of Mechanism for Redressal of Grievances of the Consumers Regulation, 2015) View
Conduct of Business Regulations,2015 View
First Amendment to APERC (Licensee’s duty for supply of electricity on request) Regulation, 2013 View
(Adoption of previously subsisting Regulations,Decisions,Directions or Orders,Licences and Practice Directions) Regulation , 2014 View
Title View
Commission issued Common Order in the matter of deciding the jurisdiction dt 31.10.2016 View
Commission passed orders in O.P.No.10 of 2016 In the matter of according approval to the two Power Purchase Agreements (PPAs) i.e, one entered into between (i) NTPC Limited and Southern Power Distribution Company of Telangana State Limited (TSSPDCL) and the other one between NTPC Limited and Northern Power Distribution Company of Telangana State Limited (TSNPDCL) for sale of power from the Telangana Super Thermal Power Project (Phase I) (2 x 800 MW) being located in Ramagundam, in Karimnagar District, Telangana State View
Commission passed orders in O.P.No.4 of 2016 between State Load Dispatch Center / Telangana State and TS Genco,Southern Regional Load Despatch Centre & Southern Regional Power Committee View
Commission passed orders in OP.No.11 of 2016 in the matter of approval/consent to the Power Purchase Agreement (PPA) entered by the Southern Power Distribution Company of Telangana Ltd. (TSSPDCL) with (i) the Individual Generators in the Solar park developed by M/s. Enrich Energy Pvt. Ltd at Zaheerabad, Medak District of 60 MW on Long Term basis (ii) M/s. Rays Power Infra Pvt Ltd., for procurement of 2 MW on Long Term basis out of 10 MW Solar Park developed by it at Dharmajipet (v),Dubbak (m), Medak District View
Commission passed orders in O. P. No. 14 of 2015 between M/s. Arhyama Solar Power Private Limited and Govt. of Telangana,TSSPDCL,TS Transco & SAO/Medak View
Commission passed orders in I. A. No. 5 of 2016 in O. P. No. 60 of 2015 between Discoms and M/s KSK Mahanadi Power Company Limited View
Commission passed orders in R. P. No. 2 of 2016 & I. A. Nos. 10 & 11 of 2016 in O. P. No. 76 & 77 of 2015 between Sugna Metals Limited and TSSPDCL & TSNPDCL View
Commission passed orders in R. P. (SR) No. 15 of 2016 in O. P. No. 92 of 2015 between M/s Sugna Metals Limited and TSSPDCL View
Commission passed orders in O. P. No. 13 of 2016 between M/s. Sundew Properties Limited and TSSPDCL View
Commission passed orders in O. P. No. 5 of 2016 View
Commission passed orders in O. P. No. 18 of 2016 In the matter of Suo-Moto Determination of Generic Tariff for energy generated from Municipal Solid Waste (MSW) and Refuse Derived Fuel (RDF) based power projects in the State of Telangana achieving CoD during the period from 13-06-2016 to 31-03-2019 View
Commission passed orders in O. P. No. 61 of 2015 and I. A. No. 23 of 2015 between M/s. Green Energy Association and Discoms & State Load Dispatch Centre View
Continuation of Retail Supply Tariffs of FY 2015-16 till further orders (Order in OP.No. 6,7 & 12 of 2016) View
Title View
Commission Intends to appoint Independent Members to the consumer Grievance Redressal Forum (CGRF)-I, for TSNPDCL Headquarters at Warangal. View
Commission Intends to appoint Independent Members to the consumer Grievance Redressal Forum (CGRF)-II, for TSSPDCL. View
Employment Notification for the post of Vidyut Ombudsman. View